Keyword
SPECTRORADIOMETER
Type of resources
Topics
Keywords
Contact for the resource
Provided by
Years
Formats
Representation types
Update frequencies
From
1
-
1
/
1
-
An area of asphalt, approximately 3m by 3m in size, within the CFARR perimeter was used as a persistent validation target and frequent reflectance measurements made as part of the (Network for Calibration and Validation of EO data (NCAVEO) 2006 Field Campaign. The centre British National Grid co-ordinates of this validation target, which can be distinguished in the CASI images, are (BNG Easting, BNG Northing) 439335.00, 138586.00. A trolley-mounted GER1500 dual field-of-view spectroradiometer was used to measure the HCRF of the asphalt validation target between 10:54 and 11:38 GMT on the 17th June.